The KUNG LONG WP 9-12 LONG Lead Acid Battery is a top choice for safety-critical applications. With a nominal voltage of 12V and a capacity of 9Ah, this sealed lead-acid battery is ideal for high-current and standby applications. It delivers 36 watts per cell during a 15-minute discharge period, ensuring dependable power. The battery’s maintenance-free design and robust performance make it suitable for alarm systems and uninterruptible power supplies. Its compact size and low weight enhance its versatility and ease of use.
Key Features
- Voltage: 12 V
 - Capacity: 9 Ah
 - Maintenance-Free Design
 - High-Current and Standby Applications
 - 36 Watts per Cell for 15-Minute Discharge
 - Compact Dimensions: 151 x 65 x 94 mm
 - Weight: 2.7 kg
 - Sealed Lead-Acid Technology
 - Connector: 6.3 mm
 
Design Features
- Sealed for Safety
 - Compact and Lightweight
 - Maintenance-Free Operation
 - Certified by VDS
 - High Discharge Power
 
Outbound Links
Internal Links





				
				
				
				
				

				
				
المراجعات
لا توجد مراجعات بعد.